Batteries in LPPV curtailmentSmoothingLoad-aware plansPolishSeed from ADMM
Result
Runnable plan
–
Lower bound
–
Gap
–
Iterations hover for detail · click to plot
#
blend
best runnable
to bound
Selected
Convergence click a point to select that iteration
Prices per kWh · drag the dots to edit import / export
Power kW · + = drawn from the meter · drag the dots to edit load and hot-water draw
Who saves what each player's share of the bill · open to compute (one extra plan, with no PV)
player
bill before
bill after
change
private Δ
net gain
Rule: reimburse each device's private-cost change, then share the saving between solar and the devices over both orders of arrival, and among the devices by Aumann–Shapley. Hover for detail.
Battery energy kWh
Hot-water tank °C
Room °C · drag the dots to edit the comfort band
Flexibility cost of one step more (+) or less (−), per hour